Customer

How to cut artwork approval time from days to hours

Approvals are slow because they are ambiguous, not because customers are lazy. Send one proof rather than options, ask for a single explicit yes, make approving possible on a phone in one tap, and chase automatically on a schedule. Shops that do all four typically move from days to hours without asking customers to behave differently.

Approval is where most orders lose their week. Four changes that move the average from days to hours, in order of effort.

Ask a shop owner where orders lose time and they will say production. Look at the timestamps and it is almost always approval: the job sat for four days with nothing happening, then got rushed through the press in an afternoon.

Nothing about that is the customer's fault. It is usually the request.

1. Send one proof, not options

Options make approving into a decision with a wrong answer, so people defer it. One proof makes it a yes or a correction, and both are fast. If they genuinely need to choose between two treatments, that is paid design work with its own step.

2. Ask for one unambiguous action

Compare these:

"Let me know if you're happy with the attached and we'll get it in the schedule."

"Approve this proof to lock your Friday delivery. Approve here."

The first is a conversation opener. The second is an instruction with a consequence and a button. Say exactly what you need, exactly what happens when you get it, and exactly what happens if you do not.

3. Make it a one-tap job on a phone

Most approvals happen on a phone, often not at a desk. That means:

A PDF attachment that has to be opened, pinched, and replied to is a task. An image with a button is a reflex.

4. Chase automatically

The chase should not depend on anyone remembering. A reminder at 24 hours and another at 72, then it appears on a human's list to call. And every reminder should restate the date consequence, because that is the only part that creates urgency.

The provenance that saves you later

Record which version was approved, by whom, and when. Reprint arguments are almost always about ambiguity, and ambiguity always favours the customer, correctly. A timestamped approval against a specific proof turns a dispute into a fact.

Change Effort Typical effect
One proof, not options None Removes deliberation
Explicit ask with a date consequence None Largest single gain
One-tap mobile approval Setup once Removes friction
Automated chase Setup once Removes forgetting

What this is worth

If approval is your longest stage, halving it halves your quoted lead time without touching the press. That is the cheapest capacity increase available to a print shop, and it is also what makes a rush fee credible: you cannot charge for speed while your own process loses three days.

Printer's Friend sends proofs through the customer portal with one-tap approval, records the version and timestamp against the order, and chases on a schedule. Approvals waiting on customers sit in one list rather than in someone's inbox. Where approval fits in the wider path is in the nine stages, and if a customer goes silent entirely, see when a customer ghosts an approval.

Free download

Get the pricing pack

One formula per decoration method, a worked example, and the seven numbers to watch. Free PDF.

  • One formula per decoration method
  • 100 black tees, priced line by line
  • The seven numbers to watch weekly

Questions

Should I send more than one proof option?
No, unless the customer is paying for design work. Options invite a discussion; one proof invites a decision. If the customer wants a change they will say so, and that is a faster conversation than choosing.
Is an email reply enough of an approval?
It is better than a phone call, but you want the approval attached to the exact proof version with a timestamp. When a reprint is disputed, "you approved this file on this date" ends the conversation.
How often should I chase an approval?
A reminder at 24 hours, another at 72, then a call. Automate the first two so they happen whether or not anyone remembers, and make clear what happens to the delivery date if approval slips.

Run the shop, not the chaos.

Printer's Friend turns every job in this article into a tracked order: quote, artwork approval, production stage, invoice.

Start free

Read next

Print shop workflow: quote to dispatch in nine stages → Reducing misprints: a QC checklist for apparel decorators → Inventory for blanks: par levels without over-ordering →