Operations

Inventory for blanks: par levels without over-ordering

Hold stock only where it earns its keep: fast-moving sizes and colours you reorder monthly, plus anything with an unreliable lead time. Set a par level from average weekly usage times lead time in weeks, plus a safety buffer sized by how variable that usage is. Everything else should be ordered per job.

How to decide what to hold, how much, and when to reorder, without turning your stockroom into your bank account.

Blanks are the biggest line in most print shop costs and the easiest place to trap cash. The stockroom that feels like preparedness is often several months of profit sitting in cardboard.

What deserves shelf space

Three tests. A style earns stock if it passes at least two:

  1. You reorder it monthly or more. Predictable demand is what makes a par level meaningful.
  2. The lead time hurts. If a stockout costs you a job because the supplier takes ten days, holding is buying reliability.
  3. It is not at risk of discontinuation. Fashion colours and seasonal ranges are the worst things to hold.

Everything else is ordered per job. Your supplier is a better warehouse than you are.

Setting the par level

par level = (average weekly usage x lead time in weeks) + safety buffer

The safety buffer is where judgement lives. A rough rule: half a lead time's usage for steady lines, a full lead time's usage for lines with lumpy demand or an unreliable supplier.

Item Weekly usage Lead time Buffer Par
Black tee, L 60 1 week 30 90
Black tee, XS 4 1 week 4 8
Navy hoodie, M 12 2 weeks 12 36
Fashion colour tee 3 2 weeks n/a Order per job

Note the XS line. Holding the same depth across a size curve is the most common inventory mistake in apparel: you end up with the extremes on the shelf forever and the middle always out.

Count the middle, not everything

Full stocktakes are painful, so they get skipped, so the numbers drift, so nobody trusts them, so nobody uses them. Cycle counting fixes this: count a small slice weekly, so every fast-moving line gets counted often and the slow ones eventually. Ten minutes a week beats a lost Saturday twice a year.

The three numbers to watch

Order against real demand, not the feeling of being busy

The reorder trigger should come off actual committed orders plus par levels, not off a walk round the stockroom. That means knowing what is committed to jobs already in the system and not yet pulled, which is exactly the number a walk round cannot tell you.

Printer's Friend tracks SKU-level stock with cycle counts, holds a par level per SKU, and suggests purchase orders from committed orders plus par shortfall so you are ordering against demand rather than vibes. Supplier catalogues sync where a live feed exists and import from CSV where it does not, so a quote can check stock before you promise a date.

Related: pricing screen print treats blanks as a cost line, and managing rush season is largely an inventory problem in disguise.

Free download

Get the pricing pack

One formula per decoration method, a worked example, and the seven numbers to watch. Free PDF.

  • One formula per decoration method
  • 100 black tees, priced line by line
  • The seven numbers to watch weekly

Questions

Should a small shop hold blank stock at all?
Only a narrow core. Your suppliers hold stock far more cheaply than you can, so the case for holding is speed and reliability, not price. A few fast-moving styles in mid sizes, and nothing else.
How do I set a par level?
Average weekly usage times supplier lead time in weeks, plus a safety buffer. Use a bigger buffer where usage swings a lot or the supplier is unreliable, and review the numbers quarterly rather than annually.
What about a supplier discount for bulk buying?
Compare the discount against the cost of the cash being tied up, the space, and the risk of a style being discontinued. A 5 percent discount on stock that sits for six months is usually a bad trade.

Run the shop, not the chaos.

Printer's Friend turns every job in this article into a tracked order: quote, artwork approval, production stage, invoice.

Start free

Read next

Managing rush season without hiring → Print shop workflow: quote to dispatch in nine stages → How to cut artwork approval time from days to hours →