Peak season is won by decisions made before it starts: know your real weekly capacity in impressions or stitches, publish a hard order cut-off, sequence by setup similarity rather than by due date alone, and decide in advance which work you will decline. Extra hands added in November usually reduce throughput rather than increase it.

What to decide in September so that November runs on rails: capacity, cut-offs, sequencing and the jobs you say no to.

Peak season does not reward effort. It rewards decisions made in September, when there is time to make them.

Know your capacity as a number

Not "we're pretty busy". A weekly ceiling in the unit your presses actually consume: impressions for screen, prints for DTG, stitches for embroidery, sheets for transfers.

weekly capacity = productive hours x realistic rate per hour

Productive hours means press-running hours, after setups, breaks, meetings and the inevitable interruptions. Most shops are shocked at how much smaller this is than their opening hours. That number is your promise ceiling, and every date you quote past it is a date you are hoping about.

Publish a hard cut-off, then honour it

Work backwards from your dispatch deadline:

Step Time
Carrier deadline for guaranteed delivery Fixed date
Pack and QC 1 day
Production at peak rate 5 to 10 days
Artwork and setup 1 to 2 days
Blanks in 3 to 10 days
Approval 1 to 3 days
Buffer 5 days

Add it up honestly and the cut-off is usually a fortnight earlier than shops like to admit. Publishing the honest date costs you a few late orders. Publishing an optimistic one costs you the reputation you spend the rest of the year earning.

Sequence by setup, not only by date

In normal months, first-in-first-out is fine. At peak, changeover is your enemy. Group jobs that share ink colours, screens, garment colours or hoop setups, then sequence those groups against due dates. Shops that do this find hours a week that were previously spent washing screens.

The constraint: never let sequencing push a job past its promised date. Group within slack, not across it.

Decide your no in advance

Write down, before it starts, what you will decline in peak:

Deciding this in September is a policy. Deciding it in November is a panic, and it will be inconsistent.

Where extra hands actually help

Around the skilled work, not in it. Folding, counting, boxing, labelling, and running blanks are all trainable in an hour and all steal time from your best operators. See hiring your second printer for the permanent version of this decision.

Protect the January bill

Peak season profitability is destroyed by two things: overtime you did not price, and rush jobs you took at standard rates. Your rush fee structure is what stands between a busy December and a profitable one.

Printer's Friend shows committed work against your production window on the production board, so the week that is already full looks full before you promise it. For the numbers to watch while it happens, see print shop KPIs.

Free download

Get the pricing pack

One formula per decoration method, a worked example, and the seven numbers to watch. Free PDF.

  • One formula per decoration method
  • 100 black tees, priced line by line
  • The seven numbers to watch weekly

Questions

Should I take on temporary staff for peak?
Only for tasks that need no training: folding, packing, boxing, labelling. Training a press operator during peak costs more press time than it creates, so put temporary help around the skilled work rather than in it.
When should my Christmas cut-off be?
Work backwards from your dispatch deadline through your real production lead time at peak, your blank lead time, and your approval time, then subtract a buffer week. Most shops find the honest answer is earlier than the one they publish.
How do I say no in peak season without losing the customer?
Give a date you can hold instead of a refusal, and offer a lower-setup method if it fits. "I can do this on the 12th" keeps the relationship; a missed promise on the 5th does not.

Run the shop, not the chaos.

Printer's Friend turns every job in this article into a tracked order: quote, artwork approval, production stage, invoice.

Start free

Read next

Inventory for blanks: par levels without over-ordering → Print shop workflow: quote to dispatch in nine stages → How to cut artwork approval time from days to hours →